Lonnie Miller

City of Jacksonville

View Details

Project Dates: March 2010 thru May 2013
Remediated Soil: 22,400 cubic yards (31,376 tons)
Parcels Remediated: 63

In March of 2010, the City of Jacksonville began remediation for the Lonnie Miller Site, located north of Edgewood Ave adjacent to Moncrief Road just south of Soutel Drive.  The remediation included Charles Reese Park and many single-family residences.  Remediation started in March 2010 and was completed in 2013. 

The Lonnie Miller Site remediation consisted of the removal of approximately 22,400 cubic yards (31,376 tons) of soil impacted with ash containing lead, arsenic, dioxin and PAHs above the project Remedial Goals. Contaminated soil was removed in order to provide a two-foot barrier within the impacted pervious areas across the site, stockpiled to undergo TCLP sampling/analysis, and properly manifested for transport to Trail Ridge Landfill for re-use as initial cover at the landfill.   

During the remediation, ETM in concert with the contractor worked meticulously with each individual property owner to ensure that their property was remediated to their satisfaction while meeting the requirements of the City/EPA Consent Degree. Each property was surveyed and inspected before and after remediation to ensure the restoration of the property to the pre-remediation condition or better.

Upon completion of each parcel, ETM prepared an individual completion report for EPA approval.  The completion reports included the pre- and post-construction survey with the property owner, photo documentation, a confirmation sampling plan, an as-built plan and an institutional control plan.