Shell Daily’s

First Coast Energy, LLP

View Details

At the Markets at Town Center, Jacksonville, FL

Project Cost: $5 Million
This Shell Daily’s project consists of 4.600+ square feet convenience store with 12 fueling positions, located at The Markets at Town Center PUD. ETM was responsible for coordination, civil engineering, site planning, surveying, landscape/irrigation design, permitting and construction engineering and inspection. The project consisted of the development of one of the outparcels along Gate Parkway within the Markets at Town Center Phase 1.

At Nocatee Town Center, Ponte Vedra, FL

Project Cost: $6 Million
This Shell Daily’s project consists of 5,000+ square foot convenience store with 16 fueling positions and car wash, located at Nocatee Town Center within Nocatee PUD/DRI. This was the first gas station inside Nocatee PUD/DRI. ETM was responsible for coordination, civil engineering, site planning, surveying, landscape/irrigation design, permitting and construction engineering and inspection. The project is located along Crosswater Parkway at Nocatee Town Center Phase 1 commercial development.