SR 50 Bridges over Econlockhatchee River

FDOT District 5

View Details

ETM was contracted to provide Construction Engineering and Inspection services to FDOT District 5 for the replacement of two low level bridges on SR 50 in east Orlando, FL.  This project was fast tracked during production due to concerns by local residents and government authorities over the safe passage of pedestrians across this heavily traveled bridge.  Utilizing the Design-Build delivery platform, ETM reviewed design drawings and issued Release for Construction plans for the construction of twin three-lane bridge structures that include 36” Florida I-Beams and construction over a sensitive watershed designated as an Outstanding Florida Waterway.  ETM is responsible for monitoring and inspecting the construction (including materials sampling and testing) to ensure that the project is constructed in reasonable conformity with the Released for Construction plans, specifications and special provisions for the Design-Build contract.