Crystal Springs Road Drainage Improvements

This project is located in the vicinity of the intersection of Joes Road and Blair Road in Jacksonville, Florida. The purpose of the project is to reduce flooding along an existing drainage ditch. The current drainage ditch overflows its bank and occasionally overtops Joes Road. When Joes Road overtop more than 200 homes have limited ingress and egress. The project will consist of widening and re-grading the existing ditch, replacement of the cross drain under Joes Road and associated improvements of the collection system in the adjacent neighborhoods. These improvements will also lower flood stages in the adjacent Glenda’s Meadow subdivision.

Client
City of Jacksonville

Location
Jacksonville, Florida

Project Gallery

Scroll to Top