Project Overview
Lonnie Miller Park was historically used as a disposal site for municipal waste incinerator ash. Approximately 75 acres of the 106-acre City-owned property were affected, leaving much of the land contaminated and unsuitable for public use.
Reclaiming Land for Lonnie Miller Park
Lonnie Miller Park was historically used as a disposal site for municipal waste incinerator ash. Approximately 75 acres of the 106-acre City-owned property were affected, leaving much of the land contaminated and unsuitable for public use.
Addressing the site has been a long-term effort. The City of Jacksonville selected ETM in 2007 to serve as Program Director for its ash-remediation program. ETM has helped the City connect remediation of the affected land with plans for expanded recreation facilities and the infrastructure needed to support them.
The Challenge
Years of waste disposal including incinerator ash had filled portions of the Ribault River floodplain and affected a substantial area of the park. Advancing the park expansion required plans that addressed those environmental conditions alongside utilities, access and recreational improvements.
ETM’s Role
As the City’s ash-remediation consultant, ETM evaluated the extent of contamination and developed remediation plans. The team’s responsibilities included environmental testing and evaluation, remediation design, and coordination and oversight of contaminated-material removal and clean-fill placement.
Working with the City’s Parks and Recreation Department, ETM also prepared site-improvement plans for the expansion. The scope included water and sewer utilities, a pump station and force main, walking paths, parking, basketball and tennis courts, multi-use athletic fields, and a track-and-field facility. Planning this work together connected the remediation requirements with the park’s intended recreational use.
ETM’s involvement extended into construction through construction engineering and inspection services, including a full-time onsite representative. Design for this phase spanned 2018 through 2024, and construction began in 2024.
Supporting the Park’s Future
The remediation and improvements are intended to make previously unusable land available for recreation and provide more opportunities for exercise, organized athletics and community activities. Future plans include additional baseball and softball facilities, multi-use fields and expanded walking paths.
The project brings together ETM’s environmental, site-infrastructure and construction oversight services to help the City prepare affected public land for community use.